Local Beverage Company
Emergency call: Power was lost on a Saturday due to a water main leak inside the building. All breakers had to be removed and replaced and panel interior replaced and dried out. Power was restored in 8 hours, saving valuable inventory from spoiling.
Beverage Producer
Custom De-Palletizer rebuild: De-palletizer was obsolete and non-functioning. Sloth Electric gutted used De-palletizer, installed all new PLC controls, VFD’s and sensors.
Industrial Chemical Processing Plant
Installation of New 4000 amp service, transformer, vault & switch gear.
High End Packaging Facility
PROJECT: Custom Magnet Placement and Metal Detector: System designed for cell phone box packaging. Includes design and install of control panel, PLC, touch screen, air valve manifold, proximity sensors, solenoid valve system, vacuum system, contacts for upstream and downstream interlocking, set up and debugging.